Curb & Sidewalk Issues at 1830 Lyon St

CLOSED Comment Noted. Livable Streets unable to notified constituent [no email, phone or mailing address]. "Traffic Calming Program received a TC App for Lyon Street btwn California & Sacramento streets on 3/20/19; this app is FY20 ""Anticipated timeline for applications from the FY20 Cycle:. • Fall 2019: collect data then evaluate and rank to determine which applications meet (or do not meet) the criteria for acceptance. • February 2020: notify applicants. • March - November 2020: design phase – staff selects the appropriate type, quantity and location of traffic calming device(s) for each block, then shepherds those recommendations through our review and approval process, which culminates with balloting block residents followed by public hearing. • December 2020 – February 2021: prepare measures for construction; obtain cost estimates and transfer funding (set up contract, if applicable). • March 2021 – October 2021: construction phase – devices are installed by SFPW (and a private contractor, if applicable)". - over 4 years ago #11714094
Report
Submitted Wed Nov 20, 2019

Vehicles are dangerously speeding on Lyon Street (North South). There is a school (University HS) on the corner of Lyon/Sacramento and their students walk East/West. Requesting traffic calming or better signs at this intersection.

Nature of Request: Other



address: 1830 Lyon St

coordinates x,y: 5999523.795479303, 2115333.0092966985

coordinates lat,lng: 37.78827266772853, -122.4454745926645

Timestamp Description
Fri Dec 20, 2019 05:55pm Closed with status: Comment Noted. Livable Streets unable to notified constituent [no email, phone or mailing address]. "Traffic Calming Program received a TC App for Lyon Street btwn California & Sacramento streets on 3/20/19; this app is FY20 ""Anticipated timeline for applications from the FY20 Cycle:. • Fall 2019: collect data then evaluate and rank to determine which applications meet (or do not meet) the criteria for acceptance. • February 2020: notify applicants. • March - November 2020: design phase – staff selects the appropriate type, quantity and location of traffic calming device(s) for each block, then shepherds those recommendations through our review and approval process, which culminates with balloting block residents followed by public hearing. • December 2020 – February 2021: prepare measures for construction; obtain cost estimates and transfer funding (set up contract, if applicable). • March 2021 – October 2021: construction phase – devices are installed by SFPW (and a private contractor, if applicable)".
Wed Nov 20, 2019 08:38pm Opened
Wed Nov 20, 2019 08:38pm Submitted via iPhone Iphone