- Opened
- Closed
- Description
- Construction causing traffic backup for blocks. Takes 30mins to drive one block 7:30 am when kids going to school and others to work. Inconsiderate ! What a hazard this early in the AM! SFPUC has been working in this intersection for 22 months! Unexceptable!
- Location
-
2850 19 Th Ave
37.73504, -122.47501 - Additional Details
- Nature of Request: Utility Excavation
CLOSED
#16832885
Case Resolved. The issue was resolved on 6/5/2023. The contractor is working within spec allowed lane closures. Spec allows closure of Eastbound starting at 7 am.
Activity
-
Submitted
Opened
Closed
Case Resolved | The issue was resolved on 6/5/2023. The contractor is working within spec allowed lane closures. Spec allows closure of Eastbound starting at 7 am.